TEMPORARY CAR PARKING FOR NAMA ELECTRICITY DISTRIBUTION

SCOPE OF WORK:

Bahjat Alkhawir United successfully completed a temporary car parking project for Nama Electricity Distribution in Muscat. The work involved several key stages:

• Bed Preparation: Initial preparation of the site to ensure a stable foundation.

• Backfilling with Sub-base Materials: After bed preparation, backfilling was performed using sub-base materials to provide structural support.

• Grading and Compaction: Grading the area to ensure proper leveling, followed by thorough compaction to achieve a solid surface.

• Prime Coat Application: Application of a prime coat to bind the surface.

•Parking Marking: Accurate marking of parking spaces for organized vehicle placement.

• Kerbstone Installation: Installation of kerbstones around the parking area for edge protection and to define boundaries

CLIENT

NAMA ELECTRICITY DISTRIBUTION