TEMPORARY CAR PARKING FOR NAMA ELECTRICITY DISTRIBUTION
SCOPE OF WORK:
Bahjat Alkhawir United successfully completed a temporary car parking project for Nama Electricity Distribution in Muscat. The work involved several key stages:
• Bed Preparation: Initial preparation of the site to ensure a stable foundation.
• Backfilling with Sub-base Materials: After bed preparation, backfilling was performed using sub-base materials to provide structural support.
• Grading and Compaction: Grading the area to ensure proper leveling, followed by thorough compaction to achieve a solid surface.
• Prime Coat Application: Application of a prime coat to bind the surface.
•Parking Marking: Accurate marking of parking spaces for organized vehicle placement.
• Kerbstone Installation: Installation of kerbstones around the parking area for edge protection and to define boundaries
PROJECT TYPE
CLIENT
NAMA ELECTRICITY DISTRIBUTION
Related portfolios
SCOPE OF WORK: Bahjat Alkhawir United successfully completed the Road Construction at Umq Rubakh project, which included: Concrete Roads: Construction of 1,500 meters of concrete…
SCOPE OF WORK: Bahjat Al khawir United is currently undertaking the Maintenance of Track Roads project in the Wilayat of Al Amirat. This project includes:…
We Bahjat al khawir united company did Asphalt Road work with Oman United Engineering services LLC (client) Project Name-Construction of filling stations access along Muscat…