MISCELLANEOUS WORKS

MINISTRY OF ENVIRONMENTAL AFFAIRS:

We did the construction work with Ministry of Environmental Affairs at marbat. In this project we did the construction of offices, guard room, overhead tank with height of 6 meter, sewerage networking, electrical works etc. we construct 6 sheds. we did the fence work of 3000 meter. We also did stone cladding work up to 300 square meter. In this project we also did bore –well of depth unto 100 meter. Wedid other minor civil works like plumbing, tile work, paint work, chambers for sewerage.

EZZ LINE LLC:

We have done a minor asphalt project with ezz line at salalah. In this work 1st we did prime coat in different trenches and then we did laying of asphalt as per existing thickness of road and site cleaning.

AL-JAZEERA TRADE & CONT CO:

Al-Jazeera trade& cont. co did the project of chamber installation and laying of HDPE line networking to collect storm water, in which we did asphalt work at various locations. We id the compaction on top layer and then we did the prime coat and then laying of asphalt as per existing thickness of asphalt. We dispose of all the waste asphalt material. GPS COMPANY:

We did asphalt work with GPS company after MEKHANO cyclone from behalf of Bahjat AL Khawir united company and al- sada line where the client was SSDCO. We did asphalt work at many locations. we did the rectification of asphalt area damaged by cyclone, in which we did the removal of existing asphalt, excavation till required depth, backfilling layer by layer with proper compaction, prime coat on top layer and laying of asphalt as per existing thickness of asphalt road and dispose of the damaged asphalt waste PAKISTANI SCHOOL PROJECT:

The construction of teacher’s hostel at pakistani school dahreez. The work was take over to Bahjat AL Khawir united company through minor tender by muncipality salalah. in this project we construct double storey building, which have sufficent number of rooms to accommodate the teachers. We did allthe services such as water supply connections, plumbing works, electrical works, wood work , sewerage connection . we did this project on labour charge. All the material was provided by school .

AL-BADAWI LLC:

We did a building construction project with Al-Badawi LLC on a sub-contract at thumrait . The client was Ministry of Defence (MOD). In this project we construction 35 different offices, football stadium, fencing work. We construct sub-structure as well as super structure in this project. We did excavations for combined footing, pcc for footing ,RCC beams & colums. Block work, plaster work and paint work.

MINISTRY OF EDUCATION:

We did maintenance work with ministry of education in government school at teetam. The work includes paint work, electricity works, replacement of electronic applinces like AC, ceiling fan, tube lights, exhaust fans etc, plumbing works such as replacement of wash basins, WC, damaged pipes , we carry thisjob on with material contract. All the material was approved by ministry of Education.

ABRAJ AL-ASMA COMPANY:

We did interlock and asphalt work with Abraj al-asma at salalah. more of the road cutting we did for the water supply connections. At many spots we did the road cuttings in which we did removal of existing asphalt, excavation, supply and laying of duct pipe and laying of concrete ove duct pipe, backfilling layer by layer with compaction, prime coat and laying of asphalt and then site cleaning. Most of the road cutting were related to private property. We did the same job for electrical connections too

GENERAL MINOR CIVIL WORKS:

Construction of private residential building:

We construct a private residential building at awqad area. We carried out this work as on labor’s charge, we did the job as on owner instruction and provided specifications, all the materials supplied by property owner, it was double story building. We did the water supply connection, sewage networking inside property and electricity works.

Hamdan plaza:

We did a minor job of piping network at inside hamdan plaza hotel, we divert the outlet line to connect with SSDC chamber, in this project we did removal and re-installation of interlock and kurb-stone. We did excavation for laying of UPVC pipe till required depth, back filling with compaction and site cleaning.

Road Cuttings:

We have done many road cuttings job for private Omanis for the supply of electricity or water supply connections, we got approval for the job from municipality, we given the guarantee letter to municipalityfor all the road cuts for the time period of one year.

OCTAL Raysut: We provided skilled workers to Octal raysut as on manpower supply. We also did many works as on sub- contract inside Octal raysut, like laying of P.C.C in ware houses, Block work, Plaster work etc

PROJECT TYPE

CLIENT

SSDC

Related portfolios