GALFAR ENGINEERING & CONTRACTING COMPANY

A: Asphalt reinstatement with Galfar:

We did asphalt works with Galfar in HCC project, we are following the asphalt works as on SSDC(client) approvals for the house connections. In HCC project we did asphalt work in various locations in salalah. In asphalt work includes road cutting, removal of existing asphalt, compaction fortoplayer, prime coat and laying of asphalt as per existing thickness of road, site cleaning.

B: Asphalt Settlement Works with Galfar: Since 2011 we are doing asphalt settlement works with Galfar at various locations . Initially we remove that damaged area and did the excavation till required depth , backfilling, layer by layer with compaction. On top layer prime coat and laying of asphalt and site cleaning. We covered a huge area around 5000 square meter at many locations at salalah after MEKHANO Cyclone. 23 6 .GALFAR ENGINEERING & CONTRACTING COMPANY:

C: Asphalt Work Inside Plant with Galfar: We did asphalt reinstatement work at WRP (water reclamation plant) & STP (sewerage treatment plant). Our work includes removing of asphalt from damaged area. Excavation and backfilling with compaction, prime coat and laying of asphalt as per existing thickness of road.

D: House Connection Work with Galfar: We did house connection work with galfar at various locations in salalah. We construct block work chambers inside the property, and then install SSDC chambers (Type A, TypeB ) and connect to the main SSDC line manhole. We construct block work chamber inside the property as per standerd specification, for the installation of Chmabers (Type A or Type B) we did excavation as per required depth, P.C.C , Installation of pre-cast Chambers (TypeA or Type B) Placing of Pre-cast R.C.C Slab with manhole cover, Benching inside Chmbers, Epoxy paint, for the laying of PVC pipes we did excavation as specifed depth to maintain the slope for the flow of sewage, laying of PVC pipes with fittings. Sand bedding, back filling layer by layer with compaction. (in some connections we used type C chambers because of Depth, Providing back-drop, the sizes(pipe, chamber, slabe ) are diefferent for type C. )

E. Shed Work with Galfa:

We did shed works with galfar at many locations. Inside w.r.p raysut we did installation of simple C.G.I sheets over parking Frame. Installation of G.I profile sheet over parking area at W.R.P raysut salalah. Installation of G.I profile sheets over pvc pipes store at sannayasalalah, installation of Asbestos Sheets asroof sheet for offices at sannaya store, installation of ply-board ceiling inside offices at sannaya store.

F. Asbestos sheet and False ceiling work with Galfar: We did Asbestos sheet with Galfar at Sannaya yard. We installed asbestos sheets on roof in which we covered 4 offices and 1 store room. Similarly we did false ceiling in that 4 offices.

G.Aerobic Pond Cleaning Work with Galfar: We did aerobic pond cleaing work with Galfar at old STP raysut Salalah. The depth of the pond was 4 meter full of sludge. First we did the de-watering of pond using heavy water pump. removal of sludge from the pond by heavy machinery and spread sludge at open area to let it dry. After getting dried we mixed sludge with chemicals to maintain hygiene standards, then We dispose-off in the pit and did backfilling over pit.

H. General civil works with Galfar: We did general civil works with galfar like interlock and kurb stone work at different locations. This work we did in settlement areas, house connnection works. We also did pre-cast slab work for septic tank, the dimension of slab was 10m x 3m x 0.2 m. the slab was constructed in 3 sections after that shiftedto the site and then fixed over the septic tank. We have done survey works with galfar for different works like house connections, installation of chambers, laying of pipes, proposals for sewerege connections etc. we did repairing works(tiles work, plumbing work, paint work